The only solar tracker that adapts to any terrain

Our Mission
The TRACE™ All Terrain Tracker by Nevados eliminates the need for solar site grading without sacrificing durability or performance. As a complete tracking solution, the product comes standard with advanced controls features such as terrain aware backtracking and diffuse boost algorithms. Finally, as a bonus, it just happens to be the fastest tracker to install. Win, win, win!
How we support
Developers / Asset Owners
- Access more land for your solar power projects
- Invest in durable technology, rigorously tested and proven to withstand extreme weather conditions
- Reduce or eliminate grading, permitting and environmental remediation costs
- Improve LCOE and ROI by lowering construction costs and maximizing power generation
Designers / Engineers
- Install on slopes up to 37% grade and changes in slope at each support post up to 26% grade
- Optimize site layouts to overcome land constraints and meet or exceed production targets
- Reduce grading, SWPPP and permitting requirements.
- Minimize/eliminate grading
Installers / Contractors
- Minimize/eliminate grading
- Maintain constant foundation heights and sizes with generous installation tolerances
- Reduce labor with auto-aligning bearings
- Reduce labor with self-aligning module brackets
testimonials
In a recent 800-acre solar project, our technology proved its unmatched value. Traditional tracking systems struggle with uneven landscapes, requiring costly and time-consuming land grading. But with TRACE ™All-Terrain Trackers, our client was able to avoid extensive grading, reduce environmental impact, and accelerate project timelines—all while optimizing energy production.
Products & Services
Reliable tech, Flexible design, Easy install.
HARDWARE
(Row Controllers, Zone Controllers, Weather Station)
OPERATING SYSTEM
Energy Production
Zero-Shade Backtracking
Half-Shade Backtracking
Diffuse Boost
Weather Risk Management
Automatic Wind/Snow Stow
75° Hail Stow
Flood Stow
Find our more >>
case studies

Project
MYR GROUP - CONSTRUCTION

Project
IRIS - CONSTRUCTION
In August 2021, a category 3 hurricane made landfall on the state of Louisiana devastating communities and causing massive infrastructure damage.

Project
IRIS - HURRICANE
In August 2021, a category 3 hurricane made landfall on the state of Louisiana devastating communities and causing massive infrastructure damage.

Project
Sigurd, Utah
When presented with challenging terrain, difficult soils, and a tight deadline, the Nevados ATT offered the perfect solution to meet design targets.